Coastal Group Marinal ogo

Safe Harbor Pier 77

  • This marina project was a complete design-build for Minto Communities as part of its Harbour Isle development
  • It included 60 wet slips for vessels up to 60’ with CAT-2 hurricane-resistant aluminum frame floating docks with composite decking and related utilities, staging docks, a new marine fuel system plus a state-of-the-art 130-unit dry rack storage PEMB boat barn able to withstand sustained winds of 175 mph
  • The project also included an all-new steel sheet pile seawall with a concrete cap, riprap, and various environmental elements

Timeline: 2015-2018
Marina capacity: 60 wet slips & 130 dry rack storage
Max. Vessel size: 60’
Weather condition engineering: CAT-2 Hurricane-resistant, unloaded


Request More Information

Coastal Group Marinas LLC logo

1001 N US Hwy One | Suite 710 | Jupiter, FL 33477

Dan.Moore@coastalgroupcos.com | 561.385.1429

Privacy Policy Disclaimer
© 2024 Coastal Group Marinas. All rights reserved. logo eho
Powered by Cotton & Company