Coastal Group Marinal ogo

Las Olas Marina

  • Pre-construction marina planning and design support for the re-development of this iconic marina project in “The Venice of America & Yachting Capital of the World”
  • The project is a Public Private Partnership between The City of Fort Lauderdale & Suntex Marina Investors and included very challenging re-routing of critical U/G utilities infrastructure
  • Design of a new 700,000 GPD pump station, demolition of an existing 400,000+ GPD pump station, creating a new and expanded marina basin by excavating a 4.56-acre existing parking lot, dredging 102,000 CY, 900+ linear feet of new steel sheet pile seawall and rip-rap, existing fixed concrete docks demolition and construction of a newly designed 68 slip mega-yacht marina for vessels up to 250’ with all new dock utilities and provisions for in-slip fueling
  • Two waterfront buildings including a two-story 15,000 square-foot restaurant and a 31,000 square-foot marine services building with a ship store, offices, casual restaurant, Captains & Crew lounge with roof-top gym, swimming pool, a chef’s kitchen, recreational space, and substantial crew amenities

Timeline: 2019-2022
Marina Capacity: 68 wet slips
Max. Vessel Size: 250’
Weather conditions engineering: CAT-1 Hurricane-resistant


Request More Information

Coastal Group Marinas LLC logo

Jupiter Business Center 601 Heritage Drive | Suite 212 Jupiter, FL 33458

Dan.Moore@coastalgroupcos.com | 561.385.1429

Privacy Policy Disclaimer
© 2024 Coastal Group Marinas. All rights reserved. logo eho
Powered by Cotton & Company