Coastal Group Marinal ogo

Harbourside Place

  • Design and construction of the floating dock system at this $200M waterfront mixed-use project
  • Project implemented a design-build concept and involved floating dock design and installation, electrical, water systems, and fire protection

Timeline: 2012-2015
Marina Capacity: 21 private wet slips
Max. Vessel Size: 110’
Weather Conditions engineering: CAT-2 Hurricane-resistant, unloaded


Request More Information

Coastal Group Marinas LLC logo

Jupiter Business Center 601 Heritage Drive | Suite 212 Jupiter, FL 33458

Dan.Moore@coastalgroupcos.com | 561.385.1429

Privacy Policy Disclaimer
© 2024 Coastal Group Marinas. All rights reserved. logo eho
Powered by Cotton & Company