Complete demolition & redevelopment of the old Evinrude/OMC Outboard Testing Facility on the St. Lucie River, including the planning, design, entitlements, and regulatory permitting for expanded marina basin and related amenities:
The project also includes 49,000 CY of dredging, installation of 1450 Linear Feet of new composite seawall and 1850 Linear Feet of 13’ wide floating concrete wave attenuator, and a new diesel & REC-90 gasoline fuel system with 60,000-gallon underground storage tanks.
Timeline: 2020-2024
Marina Capacity: 121 wet slips, 456 indoor dry storage
Max. Vessel Size: 160’
Weather conditions engineering: CAT-2 Hurricane-resistant, unloaded