Coastal Group Marinal ogo

Harbourside Place

  • Design and construction of the floating dock system at this $200M waterfront mixed-use project
  • Project implemented a design-build concept and involved floating dock design and installation, electrical, water systems, and fire protection

Timeline: 2012-2015
Marina Capacity: 21 private wet slips
Max. Vessel Size: 110’
Weather Conditions engineering: CAT-2 Hurricane-resistant, unloaded


Request More Information

Coastal Group Marinas LLC logo

Jupiter Office: 725 N HWY A1A I Suite E103 I Jupiter, FL 33477
Miami Office: 1750 N Bayshore Drive I Suite 1801 I Miami, FL 33132

dan.moore@cgmarinas.com | 561.385.1429

Privacy Policy ⋅ Disclaimer
© 2026 Coastal Group Marinas. All rights reserved. logo eho
Powered by Cotton & Company